We have repaired a part of the D1 motorway made of asphalt-concrete, both left and right lane in the section between 356th to 370th km.
Construction period | 04/2019 - 07/2019 |
Value of contract | 46.9 mil. CZK |
Surface repaired | 47,500 m2 |
Contractor | COLAS CZ, a.s. |