The construction was carried out by the association of companies Swietelsky stavební s.r.o., STRABAG a.s. and COLAS CZ, a.s. Each of these companies was responsible for a 1.8-kilometre-long section, with COLAS CZ being responsible for the initial section.
The main associate, Swietelsky stavební s.r.o. had 34 %, the rest had 33 % each.
It was a complete construction of a prestressed monolithic structure with a span of 29,500m pile foundation. Reinforcement of the supporting structure and installation of prestressing ropes were also included.
Construction period | 2015/04 - 2017/11 |
Value of contract | 467.6 mil. CZK (33 % COLAS CZ, a.s.) |
Contractor | Swietelsky stavební s.r.o., STRABAG a.s. and COLAS CZ, a.s. |
Main road length | 5,397 m, section made by COLAS CZ, a.s. 1,800 m |
Road surface | 60,500 m2 |
Structures | 9 in total; 3 steel (so-called tubosiders), the rest concrete, including the largest four-pole one |