I/34 Božejov - Ondřejov - Pelhřimov

1st November 2017

The construction was carried out by the association of companies Swietelsky stavební s.r.o., STRABAG a.s. and COLAS CZ, a.s. Each of these companies was responsible for a 1.8-kilometre-long section, with COLAS CZ being responsible for the initial section.

The main associate, Swietelsky stavební s.r.o. had 34 %, the rest had 33 % each.

It was a complete construction of a prestressed monolithic structure with a span of 29,500m pile foundation. Reinforcement of the supporting structure and installation of prestressing ropes were also included.

 

Construction period2015/04 - 2017/11
Value of contract467.6 mil. CZK (33 % COLAS CZ, a.s.)
Contractor
 
Swietelsky stavební s.r.o., STRABAG a.s.
and COLAS CZ, a.s.
Main road length5,397 m, section made by COLAS CZ, a.s. 1,800 m 
Road surface60,500 m2
Structures
 
9 in total; 3 steel (so-called tubosiders),
the rest concrete, including the largest four-pole one
Length of structures211 m in total
 