The bridge over D11 Motorway carries the local road Horní Počernice - Běchovice.
The bridge has a directional curve with a radius of 190.5 m.
The bridge is a steel-concrete structure with four I-type steel girders up to 1.7 m high.
The weight of the steel structure is 191 tons.
Estimated volume of concrete: 1 245 m3
Construction period | 04/2023 - 04/2024 |
Value of project | 88,9 mil Kč |
Contractor | COLAS CZ, a.s. |
Length of construction | 68,6m |