The motorway construction of a section of the D3 motorway is 7,197 m long and has been designed in a flat terrain near České Budějovice and its agglomeration.
The project includes the construction of noise barriers, bridges over the Čertík and Vrátecký brooks and the 999.5 m long Pohůrka tunnel. The construction is going to end with the Hodějovice roundabout under the future railway crossover at the 138.437 kilometre. It will be a bridged rotary intersection and will connect the south-eastern part of České Budějovice. The roundabout strip will be carried over the motorway by two viaducts.
Construction period | 2019 - 2024 |
Value of project | 5.286 bil CZK |
Contractor | D3 O310/I Úsilné Hodějovice Company, HOCHTIEF CZ, COLAS CZ, a.s., M-SILNICE |
Length of construction | 7,2 km |