COLAS is building another section of D48. The four-lane road, which is currently not compliant with the standard categories, will become a fully-fledged and safe motorway that will connect the D1 with Poland once fully completed.
The thirteen-kilometre Bělotín - Rybí section is currently under construction; the reconstruction of which is being carried out by COLAS CZ, a.s. and FIRESTA-Fišer. COLAS is mainly responsible for the construction of the earthworks, structural layers, drainage and cement-concrete pavement; construction of auxiliary roads; relocation of local roads, traffic signs; relocation of energy distribution lines and vegetation management.
Construction period | 2021 - 2024 |
Value of the contract | 3.084 bil. Kč |
Contractor | COLAS CZ, a.s., FIRESTA-Fišer, a.s. |
Length of road | 13 km |