I/27 Alžbětín – Roundabout & Bridge (ev. No. 27-117)

The project in Alžbětín consisted of a construction of a brand new three-arm roundabout behind a former customs building in the direction to Germany with a diameter of 35 m, a parking lot next to a duty-free shop, necessary adjustments of existing utility systems and public lighting and a reconstruction of a bridge (ev. No. 27-177).

A new asphalt layer was laid in the entire section of the area, which is located in the 4th nature protection zone of the Šumava Protected Landscape Area. In addition to the brand new asphalt layer, the substructure and supporting structure of the bridge have been repaired as well.

 

Construction period08/2019 - 10/2020
The value of the contract27.3 mil CZK
ContractorConsortium I/27 Alžbětín - COLAS CZ, a.s., SMP (COLAS CZ, a.s. SO 101; 102; 110; 151; 401 a 801 SMP CZ – SO 201)
Operating station185.918 km – 186.272 km
 

Contact form

Send message
Tento web používá pro správné fungování COOKIES
souhlasím
odmítnout
více