The reconstruction was realised by "Sdružení CPI" - an association of companies COLAS CZ, a.s. and Porr a.s. The association was led by COLAS CZ, a.s.
Construction period | 2013/04 - 2015/11 |
Value of contract | 714.5 mil CZK |
Contractor | Sdružení CPI - COLAS CZ, a.s., Porr a.s. |