The project consisted of a relocation of the II/210 road, which was carried out along the western edge of Sokolov from the Chebská intersection to the Kraslická intersection.
Construction period | 09/2015 - 11/2020 |
Value of contract | 144.8 mil. CZK |
Length of the bridge crossing | 295 m |
Surface of asphalt covering | 2,654.9 m2 |
Contractor | COLAS CZ, a.s. |