Václav Havel Airport Prague - Repairs of TWY A & Z

1st May 2018

A renovation of an asphalt cover of two taxiways TWY - A and Z, an extension of supporting structures and widening of several specific sections. The project also included a repair of already-existing distribution systems as well as installing brand new ones; a construction of shafts and a lighting supply; an exchange of cover lids and a renewal of daily marking systems.

All work was subject to air traffic safety. If there was a low visibility of the LVP (Low Visibility Procedures), all work had to be suspended and the construction site cleared as quickly as possible. The site was always fenced and the arrival of workers was only possible with an escort who was responsible for meeting the safety and operational conditions specified by the client.

 

Construction period08/2017 - 05/2018
Value of contract43.6 mil. CZK
Contractor COLAS CZ, a.s.
 

Contact form

Send message
Tento web používá pro správné fungování COOKIES
souhlasím
odmítnout
více